T1A04
Technician exam question pool 2026-2030, group T1A
How do you receive official notification of your new license and call sign after passing the exam?
- A. Email from the FCC with a link to download the license grant Correct answer
- B. USPS First-Class Mail from the FCC
- C. Email from the lead volunteer examiner
- D. USPS First-Class Mail from the lead volunteer examiner
Reference: [97.23]
Why A is correct
Section 97.23 requires each license grant to include a valid email address for electronic correspondence from the FCC. After the VE files your application, the FCC notifies you by email with a link to access your grant in the ULS system.
Why the others are wrong
- B: The FCC does not mail physical license grants via USPS; notification is electronic per 97.23.
- C: The lead VE submits the application to the FCC but does not send the license notification itself.
- D: The lead VE has no role in delivering the grant, and the process is electronic, not USPS mail.
Remember: FCC emails you a link; VEs just file the form.
Previous (T1A03) · All T1A questions · Next (T1A05)
Take a free Technician practice exam
Study smarter on iPhone: progress tracking, smart review and cram mode, offline. Get RadioFluent free on the App Store.
Questions: NCVEC question pools (public domain), JSON via russolsen/ham_radio_question_pool (Apache 2.0, notices).