RadioFluent · Practice exams

T0B08

Technician exam question pool 2026-2030, group T0B

Which is a proper grounding method for a tower?

  1. A. A single four-foot ground rod, driven into the ground no more than 12 inches from the base
  2. B. A ferrite-core RF choke connected between the tower and ground
  3. C. A connection between the tower base and a cold-water pipe
  4. D. Separate eight-foot ground rods for each tower leg, bonded to the tower and each other Correct answer

Why D is correct

Each tower leg gets its own eight-foot ground rod, all bonded to the structure and to each other. This gives multiple low-impedance paths to earth and keeps the whole tower at the same potential during a strike.

Why the others are wrong

Remember: One eight-foot rod per leg, all bonded together.

Previous (T0B07) · All T0B questions · Next (T0B09)

Take a free Technician practice exam

Study smarter on iPhone: progress tracking, smart review and cram mode, offline. Get RadioFluent free on the App Store.

Questions: NCVEC question pools (public domain), JSON via russolsen/ham_radio_question_pool (Apache 2.0, notices).